top of page

Structural Steelwork On A Two-Storey Extension

This project involved the construction of a substantial two-storey rear extension supported by a carefully designed structural steel frame. The work included reinforced concrete foundation pads, four upright steel columns, a six-metre box-section beam, four returning floor-support beams and an additional goalpost frame connecting the extension to the existing house. Four individual concrete pads were excavated and poured, each measuring 1,050mm × 1,050mm × 400mm deep. The four steel columns were positioned on these foundations, secured through their base plates and carefully checked for line, level and alignment before the main steelwork was installed. The principal beam at the rear of the extension was a six-metre-long, 300mm × 200mm box section with a 10mm steel plate attached to its underside. Due to the size and weight of the beam—and the restricted access around the side and rear of the property—it could not be moved safely into position by hand. A crane was hired specifically for the installation. The beam was lifted from the front of the property, carried over the roof and carefully lowered into position between the two outer columns. Once correctly seated and aligned, the beam was bolted securely to the column connections to complete the main outer frame. Four additional steel beams were then installed, returning from the top of the box-section beam to the existing house. These beams formed the primary support for the upper floor of the new extension, transferring its load through the steel frame and down onto the concrete foundation pads. A separate steel goalpost frame was also installed against the back of the existing property. This allowed a substantial section of the original external wall to be removed, creating a wide opening between the house and the new extension while maintaining permanent support for the structure above. Work Undertaken Excavation and preparation of four structural foundation pads Construction of four 1,050mm × 1,050mm × 400mm concrete pads Setting out and installation of four upright steel columns Bolting the column base plates to the concrete foundations Planning and coordination of the crane lift Crane lifting the main beam over the existing property Installation of a six-metre, 300mm × 200mm box-section beam with 10mm bottom plate Lowering and aligning the beam between the outer columns Bolting the main beam and columns together Installation of four steel beams returning to the existing house Formation of the structural support for the extension’s upper floor Temporary support of the existing rear structure Installation of a separate steel goalpost frame Controlled removal of the existing rear wall Formation of a large opening connecting the house and extension Construction of the extension around the completed steel frame Project Result The completed steel frame provided the strength and stability required for the new two-storey extension while allowing the ground floor to remain spacious and open. Careful planning was particularly important because of the restricted access and the weight of the six-metre box-section beam. Using a crane allowed the steelwork to be lifted over the house and lowered accurately into position, avoiding unsafe manual handling and enabling the beam to fit neatly between the prepared columns. The four returning beams created a strong platform for the upper storey, while the goalpost frame opened the rear of the existing house into the extension. Together, the steelwork and concrete foundations formed a robust structural system that successfully transferred the loads from the new upper floor down into the ground.
Date
April 2025
Location
Maghull
bottom of page