Structural Steelwork On A Two-Storey Extension
This project involved the construction of a substantial two-storey rear extension supported by a carefully designed structural steel frame. The work included reinforced concrete foundation pads, four upright steel columns, a six-metre box-section beam, four returning floor-support beams and an additional goalpost frame connecting the extension to the existing house.
Four individual concrete pads were excavated and poured, each measuring 1,050mm × 1,050mm × 400mm deep. The four steel columns were positioned on these foundations, secured through their base plates and carefully checked for line, level and alignment before the main steelwork was installed.
The principal beam at the rear of the extension was a six-metre-long, 300mm × 200mm box section with a 10mm steel plate attached to its underside. Due to the size and weight of the beam—and the restricted access around the side and rear of the property—it could not be moved safely into position by hand.
A crane was hired specifically for the installation. The beam was lifted from the front of the property, carried over the roof and carefully lowered into position between the two outer columns. Once correctly seated and aligned, the beam was bolted securely to the column connections to complete the main outer frame.
Four additional steel beams were then installed, returning from the top of the box-section beam to the existing house. These beams formed the primary support for the upper floor of the new extension, transferring its load through the steel frame and down onto the concrete foundation pads.
A separate steel goalpost frame was also installed against the back of the existing property. This allowed a substantial section of the original external wall to be removed, creating a wide opening between the house and the new extension while maintaining permanent support for the structure above.
Work Undertaken
Excavation and preparation of four structural foundation pads
Construction of four 1,050mm × 1,050mm × 400mm concrete pads
Setting out and installation of four upright steel columns
Bolting the column base plates to the concrete foundations
Planning and coordination of the crane lift
Crane lifting the main beam over the existing property
Installation of a six-metre, 300mm × 200mm box-section beam with 10mm bottom plate
Lowering and aligning the beam between the outer columns
Bolting the main beam and columns together
Installation of four steel beams returning to the existing house
Formation of the structural support for the extension’s upper floor
Temporary support of the existing rear structure
Installation of a separate steel goalpost frame
Controlled removal of the existing rear wall
Formation of a large opening connecting the house and extension
Construction of the extension around the completed steel frame
Project Result
The completed steel frame provided the strength and stability required for the new two-storey extension while allowing the ground floor to remain spacious and open.
Careful planning was particularly important because of the restricted access and the weight of the six-metre box-section beam. Using a crane allowed the steelwork to be lifted over the house and lowered accurately into position, avoiding unsafe manual handling and enabling the beam to fit neatly between the prepared columns.
The four returning beams created a strong platform for the upper storey, while the goalpost frame opened the rear of the existing house into the extension. Together, the steelwork and concrete foundations formed a robust structural system that successfully transferred the loads from the new upper floor down into the ground.
Date
April 2025
Location
Maghull

01
Structural Steelwork On A Two-Storey Extension

01
20250523_151215

02
20250523_151141

03
20250523_151135

04
20250523_151128

05
20250523_151124

06
20250522_091222

07
20250522_090349

08
20250516_150730

09
20250516_150551

10
20250512_104505
bottom of page