top of page

Chimney Breast Removal

This project involved installing a structural steel support system to carry the weight of the existing chimney above, allowing the lower chimney breast to be safely removed. Before any masonry was disturbed, the chimney breast and surrounding structure were temporarily supported using Acrow props and strongboys. This ensured that the retained masonry remained fully supported throughout the structural work. An access pocket was carefully formed through the external wall from the garden. This provided a direct route for the steelwork, as the length and position of the beams meant they could not be brought into place through the house. Two parallel-flange steel beams were inserted through the external pocket, passed through the chimney breast and positioned onto the supporting wall between the living room and dining room. The beams were installed with the bearing specified by the structural engineer. A 10mm steel plate was incorporated with the two beams to create a strong supporting structure beneath the retained chimney. Together, the beams and plate transfer the weight of the masonry above safely onto the supporting walls at either end. Once the permanent steelwork was secured and the surrounding masonry made good, the lower chimney breast could be removed in a controlled sequence. The steels were then ready to be encased in fire-resistant board before plastering and final decoration. Work Undertaken Preparation and protection of the working area Temporary support using Acrow props and strongboys Supporting the existing chimney and masonry above Formation of an installation pocket through the external wall Insertion of two parallel-flange steel beams from the garden Passing the steels through the chimney breast Positioning the beams onto the supporting internal wall Providing the structural engineer-specified bearing Incorporation of a 10mm steel plate Securing the permanent structural support Controlled removal of the lower chimney breast Making good the external access pocket and surrounding masonry Fire-resistant boarding around the steelwork Preparation for plastering and final finishes Project Result The new steelwork provides permanent support to the retained chimney above, allowing the lower chimney breast to be removed safely without affecting the structural integrity of the remaining masonry. Forming the access pocket through the external wall allowed the long steel sections to be installed accurately with minimal disruption inside the property. The project required careful temporary support, controlled masonry removal and precise positioning of the permanent steelwork.
Date
July 2026
bottom of page