top of page

Structural Alteration - Coronation Road

This project involved major structural alterations to create a larger, more open-plan living space between the existing kitchen and adjoining room. Before removing the internal masonry, the structure was carefully supported using Acrow props. Two foundation pads were then excavated to provide solid support for the new load-bearing brick piers. Each pad was reinforced with steel mesh before concrete was poured. Existing drainage, pipework and other services ran through one of the foundation areas. These services were carefully protected and boxed around before concreting, allowing them to remain accessible and preventing direct contact with the new foundations. Two substantial 330mm × 330mm brick piers were built from the new foundation pads using a traditional sand, lime and cement mortar mix. Once the piers had reached the required height and the masonry had gained sufficient strength, the structural steels were carefully positioned and installed. The supported masonry was then removed in a controlled sequence, transferring the load safely onto the new steelwork and brick piers. To complete the structural phase, the steels were fully encased in fire-resistant board, ready for jointing, plastering and the final interior finishes. The completed alterations created a significantly larger and more practical open-plan space while providing a strong, properly supported structure. Work Undertaken Careful preparation and controlled removal of existing finishes Temporary support of the masonry using Acrow props Excavation of two structural foundation pads Installation of steel reinforcement mesh Protective boxing around existing drainage and services Pouring and levelling of the concrete foundations Construction of two 330mm × 330mm load-bearing brick piers Brickwork completed using sand, lime and cement mortar Installation of the structural steelwork Controlled removal of the supported masonry Fire-resistant boarding around the completed steels Preparation of the altered areas for plastering and finishing Project Result The work transformed the original divided kitchen and living areas into a much more spacious open-plan layout. The photographs show each key stage of the project—from excavation and reinforcement through to the completed piers, installed steelwork and fire protection—demonstrating the care taken with both the structural work and the existing services.
Date
July 2025
Location
Coronation Road
bottom of page