This project involved major structural alterations to create a larger, more open-plan living space between the existing kitchen and adjoining room.
Before removing the internal masonry, the structure was carefully supported using Acrow props. Two foundation pads were then excavated to provide solid support for the new load-bearing brick piers. Each pad was reinforced with steel mesh before concrete was poured.
Existing drainage, pipework and other services ran through one of the foundation areas. These services were carefully protected and boxed around before concreting, allowing them to remain accessible and preventing direct contact with the new foundations.
Two substantial 330mm × 330mm brick piers were built from the new foundation pads using a traditional sand, lime and cement mortar mix. Once the piers had reached the required height and the masonry had gained sufficient strength, the structural steels were carefully positioned and installed.
The supported masonry was then removed in a controlled sequence, transferring the load safely onto the new steelwork and brick piers. To complete the structural phase, the steels were fully encased in fire-resistant board, ready for jointing, plastering and the final interior finishes.
The completed alterations created a significantly larger and more practical open-plan space while providing a strong, properly supported structure.
Work Undertaken
Careful preparation and controlled removal of existing finishes
Temporary support of the masonry using Acrow props
Excavation of two structural foundation pads
Installation of steel reinforcement mesh
Protective boxing around existing drainage and services
Pouring and levelling of the concrete foundations
Construction of two 330mm × 330mm load-bearing brick piers
Brickwork completed using sand, lime and cement mortar
Installation of the structural steelwork
Controlled removal of the supported masonry
Fire-resistant boarding around the completed steels
Preparation of the altered areas for plastering and finishing
Project Result
The work transformed the original divided kitchen and living areas into a much more spacious open-plan layout. The photographs show each key stage of the project—from excavation and reinforcement through to the completed piers, installed steelwork and fire protection—demonstrating the care taken with both the structural work and the existing services.
Date
July 2025
Location
Coronation Road

01
Structural Alteration - Coronation Road

01
IMG-20250711-WA0020

02
IMG-20250711-WA0009
.jpg)
03
20250720_115751(1)
.jpg)
04
20250720_115742(1)
.jpg)
05
20250718_155524(1)

06
20250718_155521

07
20250714_154738

08
20250712_151501

09
20250711_132827

10
20250711_132816

11
20250710_152341

12
20250710_111207

13
20250709_150951
.jpg)
14
20250707_091644(0)
bottom of page