New Lane Extension And Structural Knock Through
This project involved constructing a small rear extension and connecting it to the existing house to create a larger, more practical open-plan space.
As the extension walls were built up, the structural steel beam specified by the structural engineer was installed on correctly sized padstones at both ends. Fitting the beam during construction allowed the new roof structure to be built directly from it while providing the required support for both the new and existing flat roofs.
The new flat-roof timbers were installed spanning across the steel beam. They were then stitched securely to the existing roof beams with a 1.2-metre bearing, tying the two roof structures together and providing a strong, continuous connection between the extension and the original house.
Once the structural support was in place, the external wall of the existing property was carefully knocked through. The masonry was removed in a controlled sequence to form a wide opening and connect the original room with the newly built extension.
Work Undertaken
Construction of the small rear extension
Building the blockwork walls and new window and door openings
Installation of the structural engineer-specified padstones
Installation of the steel beam as the extension was built up
Construction of the new flat-roof structure
Spanning the new roof timbers across the steel beam
Stitching the new timbers to the existing roof beams
Forming a 1.2-metre bearing between the new and existing roof timbers
Controlled knock-through into the original house
Formation of a wide internal opening
Preparation of the structure for insulation, boarding, plastering and final finishes
Project Result
The completed structural work securely joined the extension to the existing house and created a wide, open connection between the two spaces. The steel beam and stitched roof timbers provide permanent support across both sections of the flat roof, allowing the new extension to function as a natural continuation of the original room.
Date
December 2025